Book a callBuild your quote

Glossary / Controls

Change advisory board (CAB)

A change advisory board (CAB) is a group of technical and business reviewers that assesses significant changes, including their risk, testing, timing, and rollback plan, and recommends or approves them before they reach production.

Source: ITIL 4, change enablement practice (change authority; standard, normal, and emergency changes); AICPA TSP section 100, CC8.1; ISO/IEC 27001:2022 Annex A 8.32

What it means

The term comes from ITIL, the IT service management framework. A CAB usually meets on a schedule, reviews the changes queued for the next release window, and records a decision for each one. Members typically include the owners of the affected systems, operations, security, and a business representative for changes customers will notice.

ITIL 4 widened the idea. It uses the term change authority for the person or group that authorizes a given type of change, and it notes that fast-moving organizations often decentralize approval through peer review. Standard changes are low risk and pre-authorized, normal changes are scheduled, assessed, and authorized, and emergency changes go through an expedited authorization, sometimes by a separate change authority, so they can be made quickly. Many engineering teams approve routine code changes through peer review in a pull request and send only high-risk changes, such as database schema or network changes, to a CAB.

Where it shows up in an audit

SOC 2 criterion CC8.1, ISO 27001:2022 Annex A 8.32, and the program change area of SOX ITGC testing require changes to be authorized, tested, and approved, and none of them names a CAB. A CAB is one way to provide the approval. Auditors test the process the company describes, so a control that names a CAB commits the company to CAB evidence for every change in the CAB's scope.

For changes in that scope, we inspect the meeting record or the approval in the change ticket, confirm the approval came before deployment, check attendance against any quorum the CAB charter sets, and test that changes classified as standard met the pre-approved criteria.

Example

A payments company's change policy sends every database schema change and firewall change to a weekly CAB of the infrastructure lead, the security lead, and the owner of the affected application, and requires two of the three to approve. The auditor samples 12 of the 58 changes the CAB handled between January 1 and June 30, 2026. For each one, the auditor matches the change ticket to the record of the Tuesday meeting before deployment, confirms two approvals, and compares the approval date with the deployment timestamp. One firewall change went through the emergency path: it was deployed on Thursday, April 9, and approved at the April 14 meeting. The emergency procedure requires approval within two business days after deployment, and April 14 was the third business day, so the auditor reports an exception.

Related terms

IT general controls (ITGCs): what they are and how auditors test them

Price your audit

The quote builder shows your fee line by line, with or without a compliance platform.

Build your quote