Book a callBuild your quote

Glossary / Controls

Control activities

Control activities are the actions, set through policies and procedures, that carry out management’s directions to reduce risk, such as approvals, reconciliations, and access restrictions. They are one of the five components of the COSO framework.

Source: COSO Internal Control, Integrated Framework (2013), principles 10 to 12; AICPA TSP section 100, CC5.1 to CC5.3

What it means

COSO's 2013 Internal Control framework defines control activities as “the actions established through policies and procedures” that help ensure management's directives to reduce risk are carried out. Three of COSO's 17 principles cover them:

  • Principle 10: the organization selects and develops control activities that reduce risks to acceptable levels.
  • Principle 11: it selects and develops general control activities over technology.
  • Principle 12: it deploys control activities through policies that set expectations and procedures that put them into action.

Control activities can be preventive or detective, and manual or automated. Authorizations and approvals, verifications, reconciliations, physical controls, and segregation of duties are all control activities.

Where it shows up in an audit

The SOC 2 trust services criteria restate COSO principles 10 to 12 as common criteria CC5.1 to CC5.3. Criteria CC6 through CC9 then add security-specific control activities: logical and physical access, system operations, change management, and risk mitigation, including vendor management. Most of the controls an auditor samples in a SOC 2 Type 2 are control activities.

In SOX ITGC testing, the ITGCs are control activities under principle 11, and the application controls they protect fall under principle 10. In ISO 27001 internal audits, the Annex A controls listed in the Statement of Applicability play the same role.

Example

Under CC5.3, a company's access policy states that the data owner approves all production database access. The procedure that puts the policy into action is a ticket workflow: a request in the service desk, approval by the named data owner, and provisioning by the database team. The auditor tests that procedure under CC6.3, which covers authorizing access to data, by sampling access grants from the period and inspecting each one for the data owner's approval dated before the access was granted.

Related terms

SOC 2 controls list: what auditors test in each area

Price your audit

The quote builder shows your fee line by line, with or without a compliance platform.

Build your quote