What it means
PCAOB AS 2201 says a deficiency in internal control over financial reporting exists when a control's design or operation does not let management or employees, in their normal work, prevent or detect misstatements on a timely basis. It comes in two forms:
- Design deficiency: “a control necessary to meet the control objective is missing,” or an existing control would not meet the objective even when performed as designed.
- Operating deficiency: a well-designed control does not operate as designed, or the person performing it lacks the authority or competence to do it effectively.
Severity rises in three steps. A deficiency is the base level. A significant deficiency is less severe than a material weakness yet important enough to merit the attention of those who oversee financial reporting. A material weakness creates a reasonable possibility that a material misstatement will not be prevented or detected on a timely basis.
Where it shows up in an audit
The three levels come from audits of internal control over financial reporting under SOX 404, and AICPA standards use the same terms when a financial statement auditor reports control findings under AU-C section 265. When SOX ITGC testing finds an exception, management first decides whether it is a deficiency, then whether it rises to a significant deficiency or a material weakness, alone or combined with other deficiencies.
SOC reports use different words. A failed test in a SOC 1 or SOC 2 Type 2 is an exception, also called a deviation, and the report lists it, often alongside a response from management. The opinion changes only when exceptions mean a control objective or criterion was not met, and a SOC report does not grade exceptions as significant deficiencies or material weaknesses.
Example
During SOX ITGC testing, the tester samples 25 of 140 changes to the ERP and finds 2 deployed before approval. Both were emergency fixes approved the next morning, and a weekly review of all ERP changes by the IT director caught both. Management classifies the issue as a control deficiency, because the weekly review limited the risk, and documents a fix: emergency changes now need approval by phone or chat before deployment, logged in the ticket.
Related terms
- Significant deficiency: the middle severity level.
- Material weakness: the most severe level.
- Design effectiveness: the question behind a design deficiency.
- Compensating control: how another control can reduce a deficiency's severity.
- IT general controls (ITGCs): where many SOX deficiencies start.
IT general controls (ITGCs): what they are and how auditors test them