Book a callBuild your quote

Glossary / Controls

Control owner

A control owner is the person accountable for making sure a control operates as described: on schedule, with the right evidence, and with follow-up on what it finds. Auditors walk through each control with its owner and request samples from them.

Source: AICPA TSP section 100, CC5.3 (COSO principle 12) points of focus; ISO/IEC 27001:2022 clause 6.1.2 and Annex A 5.2

What it means

Every control in a risk and control matrix or a SOC system description needs one person accountable for it. SOC 2 criterion CC5.3, which restates COSO principle 12, includes points of focus on establishing responsibility and accountability for executing policies and procedures, performing controls in a timely manner, taking corrective action, and using competent personnel. The owner may perform the control or supervise the people who do, as when an engineering director owns change approval while individual reviewers approve each pull request. ISO 27001 uses the related term risk owner for the person accountable for a risk, and Annex A 5.2 requires information security roles and responsibilities to be defined and allocated.

Where it shows up in an audit

Control owners do most of the company's work in SOC 1 and SOC 2 examinations, ISO internal audits, HIPAA audits, and SOX ITGC testing. The auditor walks through each control with its owner, asks how it runs and what record it leaves, and sends the owner requests for the population and the sampled items. When a sample fails, the owner explains what happened, and that explanation feeds the auditor's evaluation of the exception and management's response to it.

The request list we send for every audit is mapped to the company's controls and platform, so each request names the control it tests and reaches that control's owner.

Example

A company's SOC 2 control matrix lists control CM-03: each production change is approved by someone other than its author before deployment. The owner is the director of engineering. For the April 1 to September 30, 2026 period, the auditor asks her for the deployment log, selects 25 changes, and walks through how branch protection enforces the second approval. When one change shows a self-approval during an outage, she provides the incident ticket and the review completed the next morning, and the auditor evaluates both before recording the result.

What we see in audits

Requests stall most often when the matrix lists a team as a control's owner, or a person who has left the company. Naming one current owner for each control before fieldwork starts keeps requests moving.

Related terms

SOC 2 controls list

Price your audit

The quote builder shows your fee line by line, with or without a compliance platform.

Build your quote