Book a callBuild your quote

Glossary / Risk and vendors

Risk register

A risk register is the record of an organization’s identified risks, with each risk’s owner, likelihood and impact ratings, linked controls, and chosen response. Auditors read it to test SOC 2 criterion CC3.2 and ISO 27001 clauses 6.1.2 and 8.2.

Source: NIST IR 8170 and NIST IR 8286 (risk register); AICPA TSP section 100, CC3.2; ISO/IEC 27001:2022 clauses 6.1.2 and 8.2; 45 CFR 164.308(a)(1)(ii)(A) and (B)

What it means

NIST defines a risk register as "a central record of current risks, and related information, for a given scope or organization." Those current risks include the ones an organization has accepted and the ones it plans to reduce. Neither SOC 2 nor ISO 27001 prescribes a format, so a register can live in a governance tool, a compliance platform's risk module, or a spreadsheet. Most registers carry the same fields:

  • Risk: the asset, the threat, and the weakness it exploits, such as customer data exposed through a misconfigured storage bucket.
  • Owner: the person accountable for managing the risk.
  • Inherent rating: likelihood and impact before controls, on a written scale.
  • Controls: the controls that address the risk, listed by control ID.
  • Residual rating and response: the risk left after controls, and the decision to accept, avoid, reduce, or share it.
  • Dates: the due date for any treatment and the date of the last review.

Where it shows up in an audit

In a SOC 2, the register is the main evidence for criterion CC3.2, which asks the company to identify risks across the entity and analyze them as a basis for managing them, and it supports the other risk assessment criteria, CC3.1, CC3.3, and CC3.4. We read the methodology first, then the register, looking for risks specific to the system in scope, ratings on the written scale, a link from each significant risk to its controls, and a dated management approval. In a Type 2, we need an approval or a documented update dated inside the observation period.

In an ISO 27001 internal audit, the register is part of the documented information that clause 6.1.2 requires about the risk assessment process and clause 8.2 requires about its results, and each risk needs a named risk owner. In a HIPAA audit, it supports the risk analysis and risk management specifications at 45 CFR 164.308(a)(1).

Example

A SaaS company's register lists 34 risks for its production platform. Risk R-07 reads: a laptop holding source code and cloud credentials is stolen; owner, the head of IT; inherent likelihood 3 and impact 4 on a 1 to 5 scale, a score of 12; controls, full-disk encryption, single sign-on with multi-factor authentication, and remote wipe; residual likelihood 1 and impact 3, a score of 3; response, reduce. The chief technology officer approved the register on March 12, 2026, inside the company's January to June SOC 2 Type 2 period, and the auditor inspected that approval and traced R-07's controls to their tests in section 4.

What we see in audits

The register problems we see most often are risks copied from a template that never name the company's own systems or vendors, and ratings with no written scale behind them. A register that names the systems in the system description and points to a one-page rating scale answers most of our follow-up questions.

Related terms

SOC 2 risk assessment

Price your audit

The quote builder shows your fee line by line, with or without a compliance platform.

Build your quote